Cell Design
| Day 1 | Day 2 |
|---|---|
| Introduction to Lean Enterprise | Dealing with work elements |
| (7+1) Waste | Determining the machine requirements |
| Concept of one piece flow | Cell layout |
| Determining the product family | Distributing the work |
| Determine the Takt time | Planning cell |
